Search by Type
General
Category
Category
Project Status
Project Status
Map
Search Results (38 results found)
    Page of 4    
Estimated Close Date:
August 30 2019
Status:
open icon
Description:
Replacement of the rink slab and piping for Pad 1 as well as rubber skate tile and interior hallway flooring replacement If you would like any ... Read more about ACC Rink Pad 1 Replacement & Flooring Upgrades
46 Exeter Rd, Ajax
Estimated Close Date:
October 31 2019
Status:
open icon
Description:
The projects includes the following: Full depth road reconstruction Urban cross section with new curb and gutter New 1.5m sidewalk Replacement ... Read more about Admiral Road Reconstruction from Parry Road to Roosevelt Avenue
Estimated Close Date:
November 29 2019
Status:
open icon
Description:
Facility upgrades including; Completion of a designated substance survey report Completion of a structural assessment report Removal and ... Read more about Ajax Cricket Clubhouse - Upgrades
615 Clements Rd, Ajax
Estimated Close Date:
October 31 2019
Status:
open icon
Description:
The Road work include the following: 3.5m traffic lanes (on each side) 3m left turn lane at intersections 1.5m on-road bike lanes on both ... Read more about Church Street Bridge and Road Reconstruction from Rossland Road to Hydro Corridor
Estimated Close Date:
October 31 2019
Status:
open icon
Description:
The project includes the following: Full depth road reconstruction – Harwood Ave. to Pickering Beach Rd. Urban cross section with new curb ... Read more about Dreyer Drive Reconstruction from Harwood Avenue to Pickering Beach Road
Estimated Close Date:
November 30 2019
Status:
open icon
Description:
The project includes the following: Full depth road reconstruction Rural cross section with ditches New post and paddle fencing to prevent ... Read more about Greenwood Discovery Pavilion Driveway Reconstruction
2290 Greenwood Rd, Ajax, L1T 4S4
Estimated Close Date:
June 14 2019
Status:
open icon
Description:
The project will include the following: Excavation and disposal of existing wood surfacing Installation of a new drainage system Installation of ... Read more about Hermitage East Playground Drainage Improvements
Estimated Close Date:
August 30 2019
Status:
open icon
Description:
Replacing existing playground equipment with new equipment. If you would like any further information or have any questions, please contact: Andrew ... Read more about Horne Parkette Playground Replacement
24 Horne Ave , Ajax
Estimated Close Date:
July 26 2019
Status:
open icon
Description:
Short trail link from end of bicycle lane to Duffins Trail.  Lion's Clubhouse Trail Design If you would like any further information or have ... Read more about Lion's Clubhouse Trail
500 Clements Road West, Ajax
Estimated Close Date:
December 21 2019
Status:
open icon
Description:
The Town of Ajax has partnered with Toronto Region Conservation Authority to complete the following work at Lions Point:  Repair the erosion ... Read more about Lions Point Stormwater Headwall Repair
    Page of 4