Each year there are often multiple projects happening at the same time throughout Ajax that can affect different areas. The construction projects that the Town of Ajax manages can be found on this page.

For all Durham Region projects, please visit the Durham Region Projects page.

Search by Type
General
Category
Category
Project Status
Project Status
Map
Search Results (38 results found)
    Page of 4    
Estimated Close Date:
May 01 2021
Status:
open icon
Description:
The resurfacing of municipal roads and associated repairs are a critical component of the Town’s infrastructure maintenance program. The roads ... Read more about 2020 Local Road Resurfacing & Neighbourhood Streetlight Improvements
Longstaff Drive, Gilmour Drive, Burrells Road, Strathy Road, Lambard Crescent and Rossland Road, Ajax
Status:
open iconOpen
Description:
The resurfacing of municipal roads and associated repairs are a critical component of the Town’s infrastructure maintenance program. The roads ... Read more about 2021 Road Resurfacing
Hewitt Crescent, Ajax, ON
Status:
open icon
Description:
Traffic control signals located where two municipally owned roads intersect are under the jurisdiction of the local municipality and maintained by ... Read more about Accessible Pedestrian Signals
Estimated Close Date:
November 01 2021
Status:
open icon
Description:
Admiral Road reconstruction from Roosevelt Avenue to Parry Road The work includes the following: Full depth road reconstruction New ... Read more about Admiral Road Reconstruction
Estimated Close Date:
August 31 2021
Status:
open icon
Description:
The Annie Crescent Pedestrian Bridge has been closed since January 2020 due to severe erosion. A Structural Assessment of the bridge was completed ... Read more about Annie Crescent Pedestrian Bridge #1003 Repair
Status:
open icon
Description:
Installation of permeable pavers in parking lot to improve stormwater management Entry features to match existing parking lots along the ... Read more about Bartlett Parking Lot Construction
Status:
open icon
Description:
The project includes the following: New 3.0m wide asphalt trail in replacement of the existing sidewalk on north side of Bayly Street from Harwood ... Read more about Bayly Street MUT Construction
Status:
open icon
Description:
As indicated in the 2019 Municipal structure inspection study, Foot Bridge 112 along the waterfront trail is due for maintenance. Design drawings and ... Read more about Bridge Rehabilitation – Bridge 112
Status:
open icon
Description:
As indicated in the 2019 municipal structure inspection study, the Church Street road bridge over Duffins Creek is due for maintenance. Design ... Read more about Bridge Rehabilitation – Bridge 18
Status:
open icon
Description:
As indicated in the 2019 municipal structure inspection study, the Church Street road bridge over Duffins Creek is due for maintenance. Design ... Read more about Bridge Rehabilitation – Bridge 18
    Page of 4