Each year there are often multiple projects happening at the same time throughout Ajax that can affect different areas. The construction projects that the Town of Ajax manages can be found on this page.

For all Durham Region projects, please visit the Durham Region Projects page.

Search by Type
General
Category
Category
Project Status
Project Status
Map
Search Results (27 results found)
    Page of 3    
Estimated Close Date:
September 30 2022
Status:
open iconOpen
Description:
The resurfacing of municipal roads and associated repairs are a critical component of the Town’s infrastructure maintenance program. The roads ... read more about 2022 Road Resurfacing
Estimated Close Date:
September 30 2022
Status:
open iconOpen
Description:
25 Mill St Community Centre Parking Lot Reconstruction Located south of Kingston Rd, west of Westney Rd S. The parking lot, concrete walkway, steps ... read more about 25 Mill Street Community Centre Parking Lot Reconstruction
25 Mill Street, Ajax
Estimated Close Date:
September 30 2022
Status:
open iconOpen
Description:
Admiral Road is currently a two lane, paved, urban roadway classified as a local road within a residential zone. The total length of roadway for the ... read more about Admiral Road Reconstruction
Admiral road, Ajax
Estimated Close Date:
December 31 2022
Status:
open iconOpen
Description:
The site is adjacent to the Applecroft Public School on the east side and is bounded by Coles Ave at the west, Coe Dr at the north and east, and ... read more about Applecroft Trail Reconstruction and Lighting Replacement
Estimated Close Date:
March 18 2022
Status:
open iconOpen
Description:
This park is located on the west side of Old Harwood Avenue at View Street. Existing playground to be replaced with new equipment, section of ... read more about Betty Bujold Park Retrofit
2 view street, Ajax, L1Z 1E4
Estimated Close Date:
December 31 2022
Status:
open iconOpen
Description:
The Town of Ajax 2019 Municipal Structure Inventory and Inspection Study provided a summary of structure condition ratings and contains a ... read more about Bridge 18 Rehabilitation
duffins creek
Estimated Close Date:
June 30 2022
Status:
open iconOpen
Description:
Located on the south side of Cedar Street at Nelson Avenue. Replace and relocate existing batting cage inclusive of pitching machine, woodshed, and ... read more about Cedar Park Batting Cage
Estimated Close Date:
October 06 2021
Status:
open icon
Description:
Notification Type: Road closure Location of Closure: Church Street North; both ends of the railway tracks approximately 240m North of Taunton ... read more about Church Street North closure from Taunton Rd to North of railway tracks
Church Street North, Ajax, ON
Estimated Close Date:
September 30 2023
Status:
open icon
Description:
Church Street trail washout detail design with TRCA Temporary repairs completed to address pedestrian safety Estimated Design Start Date: Fall ... read more about Church Street Trail Washout Repair
Church street trail, Ajax
Estimated Close Date:
June 30 2022
Status:
open iconOpen
Description:
Picture Exchange Communication Systems (PECS) are alternative/augmentative communication systems used by learners of all ages who have various ... read more about Communication Boards
Audley Recreation, Ajax
    Page of 3