Each year there are often multiple projects happening at the same time throughout Ajax that can affect different areas. The construction projects that the Town of Ajax manages can be found on this page.

For all Durham Region projects, please visit the Durham Region Projects page.

Search by Type
General
Category
Category
Project Status
Project Status
Map
Search Results (13 results found)
    Page of 2    
Estimated Completion Date:
Status:
open icon
Description:
The projects includes the following: Full depth road reconstruction Urban cross section with new curb and gutter New 1.5m sidewalk Replacement ... Read more about Admiral Road Reconstruction from Parry Road to Roosevelt Avenue
Estimated Completion Date:
Status:
open icon
Description:
Exterior renovation work includes: Replacement of the roof system Repairs to the exterior cladding How this impacts you: Equipment will be ... Read more about Ajax Main Branch Library
Estimated Completion Date:
Status:
open icon
Description:
The Road work include the following: 3.5m traffic lanes (on each side) 3m left turn lane at intersections 1.5m on-road bike lanes on both ... Read more about Church Street Bridge and Road Reconstruction from Rossland Road to Hydro Corridor
Estimated Completion Date:
Status:
open icon
Description:
The Town of Ajax has retained a contractor to reconstruct Dreyer Drive from Harwood Avenue to Clements Road including Graham Court and Farley Court. ... Read more about Dreyer Drive Reconstruction from Harwood Avenue to Pickering Beach Road
Estimated Completion Date:
Status:
open icon
Description:
The project will include the following: Excavation and disposal of existing wood surfacing Installation of a new drainage system Installation of ... Read more about Hermitage East Playground Drainage Improvements
Estimated Completion Date:
Status:
open icon
Description:
Replacement of an existing gazebo (damaged by fire), paving, and furniture
Estimated Completion Date:
Status:
open icon
Description:
The Town of Ajax has partnered with Toronto Region Conservation Authority to complete the following work at Lions Point:  Repair the erosion ... Read more about Lions Point Stormwater Headwall Repair
Estimated Completion Date:
Status:
open icon
Description:
This project includes reconstruction of trail at MCC from the parking lot to the existing splash pad, and patio concrete works. If you would like ... Read more about McLean Community Centre - Trail Reconstruction
Estimated Completion Date:
Status:
open icon
Description:
Construction of three parkettes adjacent to the storm water management pond at Mosely Crescent. One parkette at Mosely Crescent will include a small ... Read more about Mulberry Meadows Parkettes
15 Mosely Cres., Ajax
Estimated Completion Date:
Status:
open icon
Description:
Removal and relocation of existing streetlight poles and luminaires, installation of new poles, luminaires and underground wiring in new location and ... Read more about Neighbourhood Streetlight Improvements - Clements Road